Roadmap
There are no dates and no percentages. Planned stages have not started, and the order may change.
| Stage | Name | Covers | Needed | Status |
|---|---|---|---|---|
| A | Independent kernel foundation | Architecture, Boot, CPU, Memory, Scheduling, Processes, Interrupts, Security, Foundational interfaces | To complete: The foundations work together, and the checks that prove it can be repeated. | In development |
| B | Native hardware infrastructure | Device management, Storage, Networking, Peripherals, Graphics devices, Audio | To complete: Named computers start the system and use their devices in repeated tests. | Planned |
| C | Native runtime and system services | Native runtime, Application interfaces, System services, Essential system tools | To complete: A native application can be written, started and stopped safely. | Planned |
| D | Graphics and application compatibility | Hardware-accelerated graphics, Windows compatibility research, Linux compatibility research, Android compatibility research, Virtualization | To complete: Results exist for named applications on named hardware. | Planned |
| E | Desktop and gaming platform | Desktop environment, Native applications, Forge Gaming Hub, Accessibility | To complete: The desktop can be used every day by the people building it. | Planned |
| F | Security and hardware qualification | Installation, Recovery, Security review, Performance measurement, Hardware compatibility, Real application testing | To complete: Installation, recovery and security have passed independent checks. | Planned |
| G | Community testing and market introduction | Internal testing, Closed alpha, Beta, Community validation, Stable release | To start: Legal and privacy approval. To complete: A release people can recover from. | Planned |
| H | Long-term industrial expansion | Future engineering team, Technology partnerships, Enterprise support, Sustainable commercial opportunities | To start: A stable product and a registered company. | Long-term direction |
Stage A is in development. This is the scope of the whole stage. It does not say which topics have been started.
Record of the Linux-based prototype
Section titled “Record of the Linux-based prototype”These phases belong to the earlier prototype. They are kept as a record and are not steps of the roadmap above.
| Phase | Name | Status | Last updated |
|---|---|---|---|
| M0 | Project foundation | Completed | 19 Nov 2026 |
| Design V2-V4 | Visual design prototypes | Completed | 19 Nov 2026 |
| M1 | Native shell preview and live telemetry | Completed | 19 Nov 2026 |
| M2 | Task Manager and safe process actions | Completed | 19 Nov 2026 |
| M2.1 | Memory Guard | Completed | 19 Nov 2026 |
| M3 | Nested Wayland compositor | Completed | 19 Nov 2026 |
| M3.1 | Window lifecycle and input | Completed | 19 Nov 2026 |
| M3.2 | Clipboard and popup compatibility lab | Was in testing | 19 Nov 2026 |
| M4.0-M4.2 | Files app | Completed | 20 Nov 2026 |
| V5-V5.2 | Premium design and separate first-party apps | Completed | 20 Nov 2026 |
| V6.0 | Desktop foundation | Completed | 20 Nov 2026 |
| V6.1 | Task Manager redesign | Completed | 20 Nov 2026 |
| V6.2 | Files and Settings redesign | Completed | 20 Nov 2026 |
| V6.3 | Login, lock screen and encrypted accounts | Completed | 21 Nov 2026 |
| V6.4 | Desktop reliability | Completed | 22 Nov 2026 |
| V6.5 | Hardware, input and peripherals (read-only) | Completed | 23 Nov 2026 |
| V6.6 | Interactive VM preview | Completed | 23 Nov 2026 |
| V6.7-P1 | Installer core library | Completed (not merged) | 23 Nov 2026 |
| V6.7-P2 | Graphical installer | Completed (not merged) | 23 Nov 2026 |
| V6.7-P3 | Signed packages and a pinned package set | Completed (not merged) | 23 Nov 2026 |
| V6.7-P4 | Installer backend | Was in testing (not merged) | 24 Nov 2026 |
| V6.7-P5 | Live installer image | Was in development (not merged) | 24 Nov 2026 |
| Brand slice 1 | Khelforge rename and palette | Completed (not merged) | 24 Nov 2026 |
Snapshot dated 24 Nov 2026.
Earlier plans
Section titled “Earlier plans”Plans made for the prototype. The roadmap above replaces them.
| Phase | Name | Status | Last updated |
|---|---|---|---|
| V6.7-P6 | Install from the real Arch mirrors | Earlier plan | Not started |
| Hardware stages 3-8 | Input devices and hardware settings | Earlier plan | Not started |
| Phase 9 / M8 | Hardware compatibility and controls | Earlier plan | Not started |
| Phase 8 / M7 | Gaming Hub | Earlier plan | Not started |
| Research | Windows compatibility research | Earlier plan | Not started |
| Phase 10 / M9 | Recovery and release engineering | Earlier plan | Not started |
| Cloud milestone | Online account features | Earlier plan | Not started |
| Brand next slices | Khelforge themes and internal rename | Earlier plan | Not started |
Snapshot dated 24 Nov 2026.