Skip to content

Roadmap

ReferenceNo release yetLast verified

There are no dates and no percentages. Planned stages have not started, and the order may change.

StageNameCoversNeededStatus
AIndependent kernel foundationArchitecture, Boot, CPU, Memory, Scheduling, Processes, Interrupts, Security, Foundational interfacesTo complete: The foundations work together, and the checks that prove it can be repeated.In development
BNative hardware infrastructureDevice management, Storage, Networking, Peripherals, Graphics devices, AudioTo complete: Named computers start the system and use their devices in repeated tests.Planned
CNative runtime and system servicesNative runtime, Application interfaces, System services, Essential system toolsTo complete: A native application can be written, started and stopped safely.Planned
DGraphics and application compatibilityHardware-accelerated graphics, Windows compatibility research, Linux compatibility research, Android compatibility research, VirtualizationTo complete: Results exist for named applications on named hardware.Planned
EDesktop and gaming platformDesktop environment, Native applications, Forge Gaming Hub, AccessibilityTo complete: The desktop can be used every day by the people building it.Planned
FSecurity and hardware qualificationInstallation, Recovery, Security review, Performance measurement, Hardware compatibility, Real application testingTo complete: Installation, recovery and security have passed independent checks.Planned
GCommunity testing and market introductionInternal testing, Closed alpha, Beta, Community validation, Stable releaseTo start: Legal and privacy approval. To complete: A release people can recover from.Planned
HLong-term industrial expansionFuture engineering team, Technology partnerships, Enterprise support, Sustainable commercial opportunitiesTo start: A stable product and a registered company.Long-term direction

Stage A is in development. This is the scope of the whole stage. It does not say which topics have been started.

These phases belong to the earlier prototype. They are kept as a record and are not steps of the roadmap above.

PhaseNameStatusLast updated
M0Project foundationCompleted19 Nov 2026
Design V2-V4Visual design prototypesCompleted19 Nov 2026
M1Native shell preview and live telemetryCompleted19 Nov 2026
M2Task Manager and safe process actionsCompleted19 Nov 2026
M2.1Memory GuardCompleted19 Nov 2026
M3Nested Wayland compositorCompleted19 Nov 2026
M3.1Window lifecycle and inputCompleted19 Nov 2026
M3.2Clipboard and popup compatibility labWas in testing19 Nov 2026
M4.0-M4.2Files appCompleted20 Nov 2026
V5-V5.2Premium design and separate first-party appsCompleted20 Nov 2026
V6.0Desktop foundationCompleted20 Nov 2026
V6.1Task Manager redesignCompleted20 Nov 2026
V6.2Files and Settings redesignCompleted20 Nov 2026
V6.3Login, lock screen and encrypted accountsCompleted21 Nov 2026
V6.4Desktop reliabilityCompleted22 Nov 2026
V6.5Hardware, input and peripherals (read-only)Completed23 Nov 2026
V6.6Interactive VM previewCompleted23 Nov 2026
V6.7-P1Installer core libraryCompleted (not merged)23 Nov 2026
V6.7-P2Graphical installerCompleted (not merged)23 Nov 2026
V6.7-P3Signed packages and a pinned package setCompleted (not merged)23 Nov 2026
V6.7-P4Installer backendWas in testing (not merged)24 Nov 2026
V6.7-P5Live installer imageWas in development (not merged)24 Nov 2026
Brand slice 1Khelforge rename and paletteCompleted (not merged)24 Nov 2026

Snapshot dated 24 Nov 2026.

Plans made for the prototype. The roadmap above replaces them.

PhaseNameStatusLast updated
V6.7-P6Install from the real Arch mirrorsEarlier planNot started
Hardware stages 3-8Input devices and hardware settingsEarlier planNot started
Phase 9 / M8Hardware compatibility and controlsEarlier planNot started
Phase 8 / M7Gaming HubEarlier planNot started
ResearchWindows compatibility researchEarlier planNot started
Phase 10 / M9Recovery and release engineeringEarlier planNot started
Cloud milestoneOnline account featuresEarlier planNot started
Brand next slicesKhelforge themes and internal renameEarlier planNot started

Snapshot dated 24 Nov 2026.